VP 30 Paint and Carpet
Client: NAVFAC SE, PWD Jacksonville, Jacksonville, FL
Project Completion: Under Construction
Project Description: Replace Carpet and Paint in the Admin Space
Project Photos:
_____________________________________________
GSA Federal Courthouse
Client: General Services Administration
Project Completion: Under Construction
Project Description: HVAS Upgrades, Painting and Flooring replacement
Project Photos:
Other Current Projects Under Construction
Naval Station Mayport,FL DC Chillers
Naval Station Mayport, FL Domestic Water Tank
Naval Station Mayport, FL Gym Resurface
Naval Air Station Jacksonville, FL H124 CRU Flooring
Naval Air Station Jacksonville, FL Carpet replacement B797
Naval Air Station Jacksonville, FL Breezeway
Naval Air Station Jacksonville, FL CDC B2070
Naval Air Station Jacksonville, FL Navy Lodge 802/803
Naval Air Station Jacksonville, FL Air Field Stripping
GSA Federal Courthouse Renovation, Gainesville, FL
GSA Federal Courthouse Pump, Gainesville, FL
Naval Station Mayport, Florida
Hurricane Matthew Water Damage Repair
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completion: April 2017
Project Description: To repair water damage caused by hurricane Matthew to multiple buildings on base. This includes mold/mildew prevention, demolition and replacement of damaged materials such as tile, carpet, base boards, drywall, doors, insulation and ceiling tiles.
Project Photos:
_________________________________________________________________________________
Naval Station Mayport, Florida
Design Build Pre-Engineered Building 1396
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completion: April 2017
Project Photos:
________________________________________________________________________________
Naval Air Station Jacksonville, FL Hanger 116
Naval Air Station Jacksonville, FL Carpet B135
Naval Air Station Jacksonville, FL Hanger 1000 Paint
Naval Air Station Jacksonville, FL Painting Hanger 30
Naval Station Mayport, FL Fall Protection
Naval Station Mayport, FL Replace Chiller
Naval Station Mayport, FL Replace Roof
Naval Station Mayport, FL Repairs at Building 1986 and 1602
Naval Station Mayport, FL Building 425
Naval Station Mayport, FL Building 1600 Structural Repairs
Naval Station Mayport, FL Building 1554
Naval Station Mayport, FL Building 2480
___________________________________________________________
Naval Station Mayport, FL Building 1333
Kitchen Remodel
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completion: March 2017
Project Description: Renovations to building 1333 Kitchen
_________________________________________________________________________________
Naval Station Mayport, FL Building 1333
Kitchen Remodel
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completion: March 2017
Project Description: Renovations to building 1333 Kitchen
________________________________________________________________________________
Townsend Bombing Range Building 3 Townsend, GA
Client: NAVFAC Mid Atlantic FEAD MCAS Beaufort
Project Completion: March 2017
Project Description: This project consisted of repairs to Bldg. 3 at Townsend Bombing Range (TBR), GA a 3030SF range operations center. Repairs included replacing interior finishes (i.e. floor/ceiling tiles, prep/paint interior/exterior walls), light fixtures, and exterior doors/windows.
_____________________________________________________________________
____________
U.S. Air Force Base Moody, Georgia
Re-Roof Building 622
Client: Moody Air Force Base
Project Completion: March 2017
Project Description: Re-Roof Building 622 a part of a BOA contract with Moody Air Force Base.
Project Photos:
_________________________________________________________________________________
Marine Corp Recuit Depot Parris Island, South Carolina
Repairs to Building 289
Client: NAVFAC Mid-Atlantic Parris Island, SC
Project Completion: February 2017
Project Photos:
_________________________________________________________________________________
Naval Station Mayport, Florida
Charlie Wharf #2 Repair
.
.
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completion: January 2017
Project Description: Repair Concrete on West Side of Pier C-1
Project Photos:
_________________________________________________________________________________
Air Station Jacksonville, FL Hanger 124 CRU Flooring
Client: NAVFAC SE, PWD Jacksonville, Jacksonville, FL
Project Completion: May 2017
Project Description: Replace CRU Flooring in Hanger 124
Project Photos:
________________________________________________________________________________
Naval Air Station Jacksonville, Florida
Renovations to Building 4
Client: NAVFAC SE, PWD Jacksonville, Jacksonville, FL
Project Completion: November 2016
Project Description: Pressure Wash, Prime and Paint Building 4 interior and exterior.
Project Photos:
_________________________________________________________________________________
Naval Air Station Jacksonville, Florida
Fuel Berms
Client: NAVFAC SE, PWD Jacksonville, Jacksonville, FL
Project Completion: March 2016
Project Photos:
_________________________________________________________________________________
Marine Corps Recruit Depot Parris Island, South Carolina
Range Operations New Building
Client: NAVFAC SE, ROICC Beaufort and PWD Parris Island, SC
Project Completed: Spring 2016
Project Description: New Range Operations Building. The work includes a new building with related site developed and related incidental work. New one story 1600 square feet building for the Marksman Training Unit. Site work, equipment pads and sidewalks. New mechanical, plumbing, electrical system, and fire alarm.
_________________________________________________________________________________
Naval Station Mayport, Florida
Renovation to Room 10 in Building 351
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completion: March 2016
Project Description: The Renovations to Room 10 Building 351 project consisted of interior upgrades including mechanical, electrical, drywall, and doors and hardware.
_________________________________________________________________________________
Naval Station Mayport, Florida
Cast-in-Place Pipe Lining
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completion: Feburary 2016
________________________________________________________________________________
Naval Air Station Jacksonville, Florida
Hospital Room Renovation
Client: NAVFAC SE, PWD Jacksonville, Jacksonville, FL
Project Completion: January 2016
Project Description: The Hospital Room Renovation project consisted of Interior renovation of hospital space, converting to new use of requirements. Scope included preliminary design, HVAC, electrical, fire protection and interior finishes.
_________________________________________________________________________________
Naval Station Mayport, Florida
Renovation to Room 131 in Building 1388
Client: NAVFAC SE, PWD Mayport, Florida
Project Completion: December 2015
_________________________________________________________________________________
Marine Corp Recruit Depot Parris Island, South Carolina
Demolition of Building 417,418 and 771
Client: NAVFAC Mid-Atlantic, ROICC Beaufort and PWD Parris Island, SC
Project Completed: September 2015
Project Description: Similar to a previous project Demolition of 204 and 904.
_________________________________________________________________________________
Naval Station Mayport, Florida
Renovation to Room 136 in Building 1388
Client: NAVFAC SE, PWD Mayport, Mayport, Florida
Project Completed: October 2015
_________________________________________________________________________________
Naval Station Mayport, Florida
Gateway Inn Project
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completed: December 2015
_________________________________________________________________________________
Naval Station Mayport, Florida
Charlie Wharf #1 Rails
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completed: October 2015
Project Description: Repairs to guard rail
Project Photos:
_________________________________________________________________________________
DOT/Federal Aviation Administration, Gainesville Florida
Electrical Replacement at Gainesville Air Traffic Control Tower
Client: DOT/Federal Aviation Administration
Project Completed: September 2015
Project Description: The Electrical Replacement at Gainesville Air Traffic Control Tower project consisted of removal and replacement of lighting fixtures, switches, ceiling tiles, and minor wiring work.
_________________________________________________________________________________
Naval Station Mayport, Florida
Water Softener
Client:NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completed: July 2015
_________________________________________________________________________________
Naval Station Mayport, Florida
Heater Conversion and Installation
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completed: March 2015
_________________________________________________________________________________
Naval Air Station Jacksonville, Florida
Waterproofing Naval Hospital
Client: NAVFAC SE, PWD Jacksonville, Jacksonville, FL
Project Completed: March 2015
Project Description:Blakeland Construction was awarded a contract from NAVFAC SE, Jacksonville to perform the NAS Galley (fixing cracks and weatherproofing) of the Naval Hospital. Blakeland utilized one contractor.
_________________________________________________________________________________
Naval Station Mayport, Florida
Repairs at Support Trailer
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completed: January 2015
Project Description: Remove existing and replace with new generator, fuel tanks, hose and fitting, and batteries. Remove existing locks and knobs. Provide a new generator, fuel tank, hose and fitting.
_________________________________________________________________________________
Naval Station Mayport, Florida
Finger Pier Repair
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completed: April 2015
_________________________________________________________________________________
Naval Station Mayport, Florida
Carpet Replacement
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completed: April 2015
_________________________________________________________________________________
Marine Corps Recruit Depot Parris Island, South Carolina
Demolition of Building 204 and 416
.
.
Client: NAVFAC SE, ROICC Beaufort and PWD Parris Island, SC
Project Completed: March 2015
Project Description: 8(a) sole source set aside. The Statement of Work includes the demolition, removal and site restoration of two buildings; Building 204 (pre-engineered metal and brick one story building, approx. 46,500 sf) and Building 416 (CMU and brick three-story building, approx. 7,133 sf/floor). Both buildings are built on piles which will be removed as part of the scope. The scope includes removal of hazardous materials (evidence of asbestos and lead paint is present in each building). Site restoration will include backfill, compaction, site grading to ensure proper drainage and seeding and sodding.
Project Photos:
_________________________________________________________________________________
Marine Corps Recruit Depot Parris Island, South Carolina
Demolition of Building 204 and 416 Additional Abatement
Client: NAVFAC SE, ROICC Beaufort and PWD Parris Island, SC
Project Completed: March 2015
Project Description: Blakeland Construction was awarded Modification from NAVFAC SE, Beaufort Branch to perform additional asbestos abatement found at Building 204. Blakeland utilized two contractors.
_________________________________________________________________________________
Marine Corps Recruit Depot Parris Island, South Carolina
Radar Dome Demolition
Client: NAVFAC SE, ROICC Beaufort and PWD Parris Island, SC
Project Completed: September 2014
Project Description: Blakeland Construction was awarded a contract from NAVFAC SE, Beaufort Branch to perform the Demolition of the Radar Dome. Blakeland utilized two contractors. Contract is complete.
Project Photos:
_________________________________________________________________________________
Naval Station Mayport, Florida
Electrical Transformer Cabinet Replacement
.
.
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completed: February 2014
Project Description: Blakeland Construction was awarded a contract from NAVFAC SE, Mayport Branch to perform the fabrication and installation of transformer cabinet . Blakeland utilized one contractor.
_________________________________________________________________________________
Naval Station Mayport, Florida
Relocate Transformer and Test/Remediation Contaminated Soil, Ribault Bay Naval Housing, Atlantic Beach, FL
Client: NAVFAC SE, PWD Mayport, Atlantic Beach, FL
Project Completed: February 2014
Project Description: 8(a) sole source set aside. The Statement of Work included the testing and removal of soil contaminated by 20 gallons of non-PCB mineral oil, which was spilled when a transformer exploded in 2006. The project included the relocation of the transformer and rerouting of electrical lines to the switch box and breaker panels. Once the transformer was relocated, the contaminated soil was excavated and the walls and ground water were tested to ensure TRPH contaminants were contained to the area of soil which was removed.
Project Photos:
_________________________________________________________________________________
Marine Corps Air Station Beaufort, South Carolina
Relocate Transformer and Test/Remediation Contaminated Soil, Ribault Bay Naval Housing, Atlantic Beach, FLBeaufort Clearing and Grubbing Service Contract, Marine Corps Air Station (MCAS)
Client: NAVFAC SE, PWD Engineering, Beaufort, SC
Project Completed: January 2014
Project Description: 8(a) sole source set aside. The Statement of Work included the clearing and grubbing over 10 acres of forest adjacent to the Marine Corps Air Field. All stumps, roots and existing debris were removed. Area was graded to existing drainage and covered with hydro-seed.
Project Photos:
_________________________________________________________________________________
Naval Station Mayport, Florida
Renovate Morale Welfare and Recreation (MWR) Recycle Facility, Naval Station
Client: NAVFAC SE, PWD Mayport, Mayport, Florida
Project Completed: April 2013
Project Description: 8(a) Sole Source. The Statement of Work included structural repairs and renovations to a 60’X 120’ metal warehouse-type MWR Recycle building. Structural repairs include repairing and replacing damaged galvanized truss columns, damaged roof trusses and bottom girt members. The project also included repairs to overhead roll-up doors, replacing damaged siding and adding gutters and downspouts.
Project Photos: